Bennelong Parkway Bridge and Connecting Paths

Council is working to provide a missing key link to in completing the Homebush Bay Circuit by building a cyclist and pedestrian bridge on the northern side of Bennelong Parkway. The proposed bridge will provide a continuous, off road foreshore access between Wentworth Point, Rhodes and Sydney Olympic Park.

Project overview

Project description

When combined with the proposed Bennelong Parkway Bridge at Haslams Creek, pedestrians and cyclists will no longer be required to cross busy Bennelong Parkway twice, and will have new connections to the foreshore promenade and safe access across Hill Road at the new traffic lights.

The upgrade of Bennelong Parkway also keeps a cycling facility on each side of the street that will allow road cyclists to continue using Bennelong Parkway much like they do today.

Council is proposing the planting of new trees with appropriate consideration being given to space limitations and sightline, along with additional safety measures including:

  • Raised priority crossings
  • Upgrades to the roundabout at The Piazza to allow a more generous circulation space and to ensure it meets modern standards.

The concept also allows for the existing bus stops to be retained and for a net increase in the number of on-street car parking spaces (though these spaces have been moved to the southern side of the road).

To view the draft concept design, scroll down the page or download the PDF from the resources section. The development application (DA) for the proposed Bridge has been lodged (DA/177/2024) - to view the DA, please visit Council's DA Tracker website here.

The project is proudly funded by the NSW Government in association with City of Parramatta Council.


PROJECT UPDATE – JUNE 2026

The Bennelong Parkway Bridge and Link will provide a safer and easier pedestrian and cyclist connection for the local community and visitors using Bennelong Parkway and the Homebush Bay Circuit in Wentworth Point.

In 2025 Council tendered for the construction of the Bridge and Link to the Badu Mangroves on the east, but a preferred contractor could not be engaged.

We know this news may be disappointing for people looking forward to this new connection. To keep the project moving, Council has already commenced a more targeted procurement process to ensure the project is achieves value for money and is delivered with minimal delay.

This will change the construction timeline and we thank the community for its patience as we work through the next steps. To ensure that we can build key parts of the project as soon as possible, Council will be staging out the delivery of different sections as outlined below.

  • Stage 1a Bennelong Parkway Bridge (red box) – New active transport bridge, path connection to Badu mangroves, and raised crossing to Wentworth Common.
  • Bennelong Parkway Link – Active transport connections on Bennelong Parkway between the new bridge and Hill Road (to be delivered as two construction phases: East and West)
    • Stage 1b Link East (purple box) is from the new bridge to the Archery Centre where there is an existing connection to the Wentworth Point foreshore promenade.
    • Stage 2 Link West (yellow box) is from the Archery Centre to the recently constructed Hill Road traffic signals.

Works are staged to prioritise a complete connection from the Wentworth Point foreshore promenade to the Badu Mangroves and Wentworth Common.