Western River Precinct Connections

Western Parramatta River and CBD Precinct Connections (WICR313)

The Western River Precinct Connections Project will deliver higher quality pedestrian and cycling routes along the Parramatta River foreshore and CBD. The project will create a more connected and accessible experience for workers, residents, and visitors in Parramatta CBD.


Public exhibition period - Now closed

Submissions on the draft concept design were welcomed until 5pm on Friday 12 September 2025.

Thank you to everyone that had their say on this project. Council officers are now reviewing all submissions and preparing a report for consideration at an upcoming Council Meeting.

Please FOLLOW this page to stay updated.


This $28.3m project is proudly funded by the NSW Government through the Western Sydney Infrastructure Grants Program.

The Western River Precinct Connection Project will better connect the Parramatta River foreshore to the city centre and nearby Parramatta Park, CommBank Stadium, Riverside Theatres and Powerhouse Parramatta.

With over 2 million annual walkers and cyclists on the Parramatta River pathways, our city continues to grow, and investment is needed to improve connections, capacity and safety. The project will address missing pedestrian and cycling links across and along the river to improve access and transform the way we experience Parramatta River. 

To be delivered in stages, the Western Parramatta River and CBD Precinct Connections Project will:

a. Deliver a new walking and cycling bridge across the river, near Marsden Street

b. Create a continuous connection along the Southern Foreshore from Parramatta CBD to Parramatta Park through a new southern foreshore boardwalk

c. Deliver a re-graded, wider and more accessible path along the northern foreshore of Parramatta River, better linking Parramatta Park in the west and Riverside Theatre in the East 

d. Revegetate foreshore landscape and improve connections to the river

e. Introduce a new safe and accessible foreshore-to-street landscape link between Jeffrey House and the Parramatta River


Project Staging

Working within the available budget, the project will be delivered in stages, with some works deferred to a future project should funding become available.  The two items for future delivery are:  

  1. The southern boardwalk connection to the west linking directly through to Parramatta Park, that requires future works within Parramatta Park to provide onward access. The boardwalk is envisaged to provide an onward, off-road connection into Parramatta Park for pedestrians and cyclists. However, as these neighbouring works are yet to be progressed, deferral is both logical and financially necessary.

  2. Upgrading the existing footpaths on the northern foreshore toward O'Connell Street.